NPO U.S.A.
1955 University Lane
Lisle, IL 60532 USA
T: (630) 963-0320
CELL(24/7): (630) 960-8500 NPO Europe
Campus de Ker Lann
Parc de Lormandière
Rue Maryse Bastié - Bât. C
35170 Bruz - France
T: +33 (0)2-23-50-13-80
F: +33 (0)2-23-50-13-90
Boiling Water Reactors (BWRs)
Challenge: BWRs wanted to reduce dose exposure when removing the In Core Radiation Monitor (IRM) cable.
Solution: Together, BWR owners and NPO designed a transporter cart and separate shielded cable puller that would directly pull and shield the cable while rolling it onto a removable reel. These systems can be manually operated or electrically driven with a remote control.
Results: The 4 inches (10.2 cm) of lead shielding reduces radiation transmission by a factor of 100 to 150, saving a significant amount of potential dose during the process.
back to Engineered ALARA Solutions
